EPCI  Solutions
EPCI  Solutions
  • Home
  • About Us
  • Project Management
  • EPC Services
    • Engineering
    • Procurement Support
    • Construction Support
    • MC & HUC
    • Documentation
  • Contact
    • Join Us
  • Library
    • OPERCOMS

Construction Support

Specific inspections and measurements must be made throughout the construction process in order to ensure that the construction is in agreement with the outfitting of equipment and bulk materials.

Equipment Installation

Picture
Prior to equipment being installed, it must be ensured that the foundations are in agreement with the equipment mounting methods. This can be particularly critical for switchboards, that have tight tolerances for level, skew and waviness.
We offer the following service:
  • Checking of equipment foundations meets the  equipment  manufacturer's specification and assisting in any remedial work
  • Ensuring all cable transit positions are in agreement with the equipment and that the size is adequate for the cables.
  • grounding and bonding methods are in place, prior to equipment installation.



Cable Systems

Picture
Installation of cable ways and transits should be complete as far as practicable prior to equipment installation. We ensure that:
  • Cableways type and size is in accordance with the plans, and the installation meets workmanship standards
  • All cableways are tagged for purpose and that the cable ways and transit are coordinated
  • Report and assist in the resolution of any cableways that appear to become over subscribed. 

Cabling

Picture
Installation of cable has become one of the main activities in complex structures. In order to meet a successful installation, it is essential to monitor and report on cable installation work, to ensure that the installation is progressing according to plan. We offer the following support:
  • Ensuring the proper cables are being installed on the correct cableways
  • Keeping logs on cable used against cable ordered, and reporting on any potential shortages
  • Ensuring that the installation of high voltage, low voltage and instrument cables are adequately spaced / on own tray to meet the Regulations / Specification